EFTA02344122
Comments
File Details
- File Name
- EFTA02344122.pdf
- Data Set
- DS 11
- Type
- Category
- financial
- Size
- 81.5 KB
- Pages
- 1
Document Text
From: Larry Visoski Sent: Tuesday, December 20, 2016 8:44 PM To: Je vacation Subject: GIV update Jeffrey Gulfstream has to manufacture the replacement angle that is corroded, delive=y date is Jan 4th. Gulfstream engineering Savanah is reviewing the corroded area, taking into a=count the part is not available until Jan 4th, and not a saftey of flight i=sue, we hope to obtain a 30 day extension from Engineering to require us to=clean, prime and install new rivets as temporary repair. I'm told I will have firm answer later today., Pylon Precooler: I spoke to Tech support, Gulfstream recommends doing a full system integrity=check of PreCooler system and cabin pressurization, which includes installi=g a temporary digital temp sensor in the pylon to make sure hot air is trig=ering the Pylon Precooler operation. Tech support suggest checking Air cycl= machine temperature outlet, since functionality and temperatures of all pr=ssurization components have an effect on preCooler operation. If we get the 30 day extension, I'd like to have Westfield, Savanah or Bruns=ick Gulfstream accomplish the corrosion repair and accomplish Precooler che=k,. If you agree? Thx Larry Sent from my iPhone=<?xml version=.0" encoding=TF-8"?> <!DOCTYPE plist PUBLIC "-//Apple//DTD PLIST 1.0//EN" "http://www.apple.com/DTDs/Propertylist-1.0.dtd"> <plist version=.0"> <dict> <key>date-last-viewed</key> <integer>0</integer> <key>date-received</key> <integer>1482266632</integer>