EFTA02288142
Comments
File Details
- File Name
- EFTA02288142.pdf
- Data Set
- DS 11
- Type
- Category
- financial
- Size
- 110.2 KB
- Pages
- 2
Document Text
To: From: Sent: Sun 5/26/2019 12:20:30 PM Subject: Re: Shade Structure/Engineering Doors Bid (LSJ/GSJ) Excellent. Thank you so much! Have a reat da Sent from my iPhonc On May 25, 2019, at 11:00 PM, ><> wrote: Hello Please find attached the proposal for the Shade Structure and the installation of doors at the engineering building. Have a wonderful weekend. Regards John Original Message Subject: Re: Shade Structure/Engineering Doors Bid (LSJ/GSJ) From: Date: Wed, May 22, 2019 6:56 m To: John Bedminster C : Mik li n , Daphne Wallace Ann Rodriquez •:>, Rich Kahn Hello John and thank you for your reply! We look forward to receiving your quote by Saturday for the Shade Structure and Engineering Doors... PM, < wrote: HI Sorry about the late response, I was pouring concrete today. I am working on preliminary layout to determine all possible aspect of the shade structure located at the flag pole and pool area. I should be able to deliver the estimate(s) by Saturday the latest. Please let me know if that is okay with you. I will be on St. John in the morning and may not have phone service. If any thing please send a text. EFTA_R1_01116220 EFTA02288142 Best Wishes John Original Message Subject: Shade /Engineering Doors Bid LSJ GS)) From Date: ue, ay , To: Hello Mr Bedminster. I would like to follow up on the bid you are to propose for the shade structure located at the flag pole pool Mike Glidden has shown