EFTA02502810
Comments
File Details
- File Name
- EFTA02502810.pdf
- Data Set
- DS 11
- Type
- Category
- financial
- Size
- 256.0 KB
- Pages
- 4
Document Text
From: jeffrey E. <[email protected]> Sent: Saturday, March 17, 2018 2:38 PM To: Larry Visoski Subject: Re: G550 update also get some covering for inside the closets. . eri= will re do but rubber or something should cover the stains. =C24> get some rubber for inside the food locker floor.. 40=A0 make sure that the doors of the coffee maker and food locker dont rattl= when opend and stored vertically.. . lets see if the lay lig=ts are on dim.? . <=r> On Sat, Mar 17, 2018 at 10:17 AM, Larry Visos=i «mailtol> wrote: Jeffrey Permagaurd is starting Application in 30min„ 1=E2 4m impressed that 2 sales reps from Permagaurd are here to critique=the application to make sure all is done properly to support their product= Gulfstream in Palm Beach has coordinating with Savanah, that 2 interio= specialist will drive down from Savannah tomorrow to start working the ai=plane Sunday and Monday., We are going to work: 1-fwd =ocket door rigging 2-all 3 tray table top issues, 3-Veneer lid opening at your VIP seat and L/H aft seat Veneer lid </=iv> 4- CMC avionics issue 5- removal of No -smoking placards<=div> 6-proper rigging of all latches I40=9911 keep you updated Thx Larry </=iv> On Mar 17, 2018, at 9:00 AM, jeffrey E. =Itjeevacation@=mail.com <mailto:[email protected]» wrote: of course. the handle in the front door should just =e veneer no metal needed On Sat, Mar 17, 2018 at 8:47 AM, Larry Visoski <mailto> wrote: Ok,,, I was also going to remove