EFTA02699144
Comments
File Details
- File Name
- EFTA02699144.pdf
- Data Set
- DS 11
- Type
- Category
- financial
- Size
- 171.2 KB
- Pages
- 2
Document Text
Punch List — June 11 2012 1. Five Palms—TOP PRIORITY - Exterior Door Shutters — removanle option - Painting Outside to be completed after visit - Furniture — Sofa — leather samples JE will review while on site piano needs tuner - Lights — - Add two more lights to front of Five Palms in trees - Mirrored siding — Panels ordered — IDA to Tropical FL 6/7 — scheduled to sail 6/8, EDA on STT 6/12 Glue on site - Tapestry Molding for Ceiling —ion- Transformer building — Building 5/31, 5/25 — final electrical hookup 6/8 — temporarily powered by generator - Flooring - Fire pit — gas and needs retrun and reoreder - Books — books on site will relocate over the week of 6/4 - Benches — one bench to west north of fire pit - Road grading - Piano — at Tropical FL 6/8 — scheduled to sail 6/13, EDA on 511 6/16 2. Grotto — - Floor resin - Genset wiring — scheduling to be determined 3. Berm/Top of Hill - dirt and rock needs on top of hill needs to go ASAP - hydroseed top of hill —4 large planter boxes with small planter inside require construction —size to be determined by JE - cleanup and excavate — continues - remove rock screener — completed - run power to berm center from pull box 4. Engineering/Maintenance Yard - Steel Shed - foundation in progress • Metal Sheets on old building will be replaced week of 6/4 5. Triangle— landscaping direction required from JE 6. Flagpole Pool Cabana - - Recovering of sofa/chairs — - Furniture — needs ne