EFTA02608966
Comments
File Details
- File Name
- EFTA02608966.pdf
- Data Set
- DS 11
- Type
- Category
- financial
- Size
- 191.7 KB
- Pages
- 5
Document Text
From: Ann Rodriquez Sent: Friday, December 21, 2018 1:26 PM To: brice gordon Cc: LSJ GSJ; Cecile de Jongh; LSJ Kyle Reavis; Elderfield Roberts Subject: Re: LSJE_KENNY_VISIT_121818 Hi all, Morning, l=will be installing on Saturday on Lsg,. I will be taking measurem=nts for Cabana, 2,3,&4 on Saturday. Yes, all piec=s for Cabana 1 will be installed on Saturday. The tops are 1=5" (4cm, 2 - .75" laminated together) The thickness in tota= is 1.5" & not sure of overhang. Sent from my iPhone On Dec 20, 2018= at 8:18 PM, brice gordon wrote: Thank you =ent from my iPhone On Dec 20, 2018, at 5:17 PM, A=n Rodriquez wrote: wi=l do <mailto Sent from my i=hone On Dec 20, 2018, at 7:59 PM, brice gordon wro=e: Good Evening regards=Brice EFTA_R1_01802504 EFTA02608966 Hi all, <=iv> Ken said that he wil= need a Barge run Saturday morning... Cabana 1 will be 100% completed on Saturday<=span> </=pan> Cabana 2= 3 & 4 will all have the long countertops but not the vanity sink becau=e the Cabinet base was not installed for measurements to be taken. Ken will take those=measurements on Saturday Flagpole pool kitchen is cut and ready to be instal=ed. <imagetjpeg><image2.jpe=><image3.jpeg><image4.jpeg><Image5.jpeg><image6.jpe=><image7.jpeg><image8.j peg><image9.jpeg><image10.jp=g> Sent from m= iPhone On Dec 20, 2018, at 11:35 AM, Ann Rodriqu=z <mailto rote: I just spoke to Ken. He have the blade and he =99s headed to his shop. I'll meet him there <imagel.p