EFTA02521687
Comments
File Details
- File Name
- EFTA02521687.pdf
- Data Set
- DS 11
- Type
- Category
- financial
- Size
- 86.6 KB
- Pages
- 1
Document Text
From: Larry Visoski < Sent: Friday, February 23, 2018 923 PM To: Je vacation Subject: Eric Jeffrey I spoke with Eric„ He will be out of town March 9-13th,„ he would like to select G550 divan ma=erial in person with you March 14th or later„ he'll need to check=Availability of a selected material, and also send for fire block certifica=ion. Eric recommends 2 to 3 weeks after you select a material before dropp=ng the G550 for Divan fabric install, as well as Divan end cap fabrication.= he will use your current foam for divan as oppose to making a second set o= divan cushions. (I think it Makes sense to fabricate new cushions to save o= Down time, maybe?), With this information, Gulfstream in Savanah can start the 24month inspectio= March 12th to be completed by March 23rd to be safe„ virtually picking up=the G550 and dropping off the GIV. This way the GIV will be ready to fly when you decide to leave the G550 at E=ic by April 1st, as long Eric has all fabrics in stock with proper fire cer=s,. I prefer Savanah over Palm Bch,,, in the past West Palm Beach has always del=vered late, I don't think we will have that issue in Savannah. Do you approve of Savannah input for GIV March 12th based on G550 in service=March 9th? Pls advise„ Thx Larry Sent from my iPhone=<?xml version=.0" encoding=TF-8"?> <IDOCTYPE plist PUBLIC "-//Apple//DTD PLIST 1.0//EN" "http://www.apple.com/DTDs/PropertyList-1.0.dtd"> <plist version=.0"> <dict> <key>conversation-id</key>